
Rancho Cali #1 Located in Brookshire Dome Field, Waller County, Texas
Drilled in December of 2008 to a depth of 2900’, and completed in January of 2009 in the upper Frio Sand the well was brought on line at a rate of 138 barrels of oil per day. After 9 months of production the well continues to produce 25–30 barrels of oil per day. There is a second well slated to be drilled in this field in the fourth quarter of 2009.
Meredith Ranch “B” #1 (Boulder) Located in Jean Field, Young County, Texas
This well was reentered in 2005 and drilled out successfully, after having been plugged and abandoned for a period of six years. After bringing this well on line as commercial producer from the Upper Caddo formation at a rate of 45 barrels of oil per day in 2005 the well has declined to a rate of 8-10 bopd. Dolberry has recently recompleted the same Upper Caddo formation by stimulating the carbonate formation by utilizing both acid and slick water sand fracturing techniques. The well was put back on line the week of October 15th, 2009 and we are waiting for results.
Meredith Ranch #1 (Cayce) Located in Jean Field, Young County, Texas.
Rigged up on well on October 26th, 2009 to attempt squeeze job. Squeeze off existing perfs at 4555’, prepare to perform drill out operation to remove remaining cement and temporary bridge plug to enable well to be perforated in Conglomerate formation at 4622’. Work on well still in progress.